Short answer: Standard grades are typically produced and released in about 7-15 working days; sea freight, clearance and inland delivery then set the arrival date.
The timeline, step by step
- Confirmation: specification, quantity, packing and commercial terms agreed; deposit or L/C opened.
- Production slot: standard grades are scheduled quickly; specialties wait for a production campaign.
- QC release: the lot is sampled and tested, and the COA is issued — see how lots are tested and released.
- Documentation: invoice, packing list, SDS and certificate of origin prepared; a pre-shipment sample can be sent if agreed.
- Loading and sailing: booking, container loading, vessel departure.
- Arrival: sea transit, customs clearance, inland delivery to your plant.
How to shorten it
- Order standard grades rather than custom specifications.
- Confirm packing and documents at order placement, not after production.
- Share a rolling forecast so material can be planned or held in stock.
For import-side steps that often cause delay, see importing bulk surfactants.