Short answer: Standard grades are typically produced and released in about 7-15 working days; sea freight, clearance and inland delivery then set the arrival date.

The timeline, step by step

  1. Confirmation: specification, quantity, packing and commercial terms agreed; deposit or L/C opened.
  2. Production slot: standard grades are scheduled quickly; specialties wait for a production campaign.
  3. QC release: the lot is sampled and tested, and the COA is issued — see how lots are tested and released.
  4. Documentation: invoice, packing list, SDS and certificate of origin prepared; a pre-shipment sample can be sent if agreed.
  5. Loading and sailing: booking, container loading, vessel departure.
  6. Arrival: sea transit, customs clearance, inland delivery to your plant.

How to shorten it

  • Order standard grades rather than custom specifications.
  • Confirm packing and documents at order placement, not after production.
  • Share a rolling forecast so material can be planned or held in stock.

For import-side steps that often cause delay, see importing bulk surfactants.